Disconnect existing wastewater connection for the existing dwg on future lot 1 & reconnect to the newly established wastewater connection & the construction of the storm water soakage system within the future row provided as part of the apprRead more
01 November 2024
Consent issued
New single storey 3 bdrm res dwg with attached single gge (proposed lot 3)
01 November 2024
Consent issued
New single storey 3 bdrm res dwg with attached dbl gge (proposed lot 2).