This listing closed and did not sell. The item has been relisted.
- Browse for similar listings in Portable cabins
- View the relisted item
Other listings you might like



Description
High-Quality Timber Homes with Customizable Options
Key Features: * Timber Construction with CCC (Code Compliance Certificate) * Extra High Wind Zone and Corrosion Zone (Sea Spray Resistant) * Superior Insulation: * R4.5 Ceiling * R2.8 Walls * R3.1 Expol Black Underfloor * Covers up to Climate Zone 4 (Upgrade available to Climate Zones 5-6) * Double Glazed Joinery for improved energy efficiency * Coastal Grade Colour Steel for a long-lasting, weather-resistant exterior * True Wood & Cedar Front Porch with Kwila Decking * Gas Hot Water System for efficiency and reliability
Interior Features: * One Bedroom with Walk-in Wardrobe * Modern Bathroom & Laundry * Walk-in Pantry * Quickstep Laminate Flooring & Carpet * Customizable Colour Schemes for joinery and steel
Special Offer: We have a home under construction—get in early and choose your joinery and colour steel options!
Upgrade Options: We also offer two-bedroom options to suit different needs.
Shipping Information: We can arrange shipping quotes to any accessible site nationwide.
Quality Guaranteed: The quality of our homes speaks for itself. Come see for yourself!
https://www.facebook.com/share/1FQuujj5Ut/?mibextid=wwXIfr
For more details or to schedule a viewing, call Blair at 021 247 2693.
Details
Shipping & pick-up options
Destination & description | Price | |
---|---|---|
To be arranged | N/A | |
Pick-up available from Paeroa, Hauraki, Waikato | Free |
Payment Options
Cash, NZ Bank Deposit
Questions & Answers (2)
does this 12.37m x 4m = 49.48 m2 need council consent? If yes what will be the cost? Plus transportation cost? and foundation cost? randy2014 (37 • 9:48 pm, Thu, 31 Jul )Hi there , Main building area it 43.48m2 plus the deck area . Cheers Blair 0212472693 smithers34 (55 • Thursday, 31 July 2025 )Does this area need concent? randy2014 (37 • 8:57 am, Mon, 4 Aug )Yes anything over 30m2 or if it includes bathroom and cooking also needs council consent . These come with code of compliance certification. There are rule changes coming early 2026 allowing up to 70m2 to be built without consent but there will be a process to follow . Cheers Blair smithers34 (55 • Monday, 4 August 2025 )