Skip to site navigation Skip to main content
main content
  1. Home
  2. Marketplace
  3. Toys & models
  4. Models
  5. Railway
  6. Rolling stock

Description

Graham Farish (N Scale) Product Code: 374-762 BR Mk2F FO First Open BR InterCity (Executive) Era: 8 (1982-1994) History British Rail's second generation of Standard Coach design is known as the Mark 2. Design and construction followed on from the universal and ubiquitous Mk1 family of coaching stock, with the prototype example built in 1963. Series production continued until 1975 at Derby Carriage Works. They were of steel construction, and of a more monocoque design than the Mk1, which added to their safety and integrity in event of collision or mishap. As passenger expectations and railway operations had moved on since the vast Mk1 range was conceived, and because there was still much life left in the Mk1s by the mid-sixties, a much reduced number of vehicle types were built. The basic Mk2 types included First and Second class accommodation, with corridors and compartments only available to First Class passengers, all Second Class coaches were conceived as open saloons. First and Second class Brake coaches were built, but no full brakes, catering cars, restaurants, buffets or sleeping cars were included, Mark 1 coaches fulfilling these needs until Mark 3s came along in the late seventies. The Mark 2 family underwent a number of tweaks and improvements during the 12 years construction period. The principal visual differences included air braking from Mk2A, removal of the central bodyside doors and vestibule (Mk2B), introduction of wrap-around corner doors and provision of one WC at each end in lieu of two at one end (Mk2B), air conditioning - so no opening windows in the saloon area (Mk2D), no side corridor First Class compartment vehicles (from Mk2E onwards), varying style and colours of end gangway doors. Bachmann has produced early and late types of Mk2 vehicles, Mk2A with the characteristic early features of this widely-travelled type, and the final evolution of the Mk2, the Mk2F, including the popular Mk2F DBSO that was converted from the standard BSO for push-pull operation between ...

Details

Condition:
New
Brand:
Graham Farish

Shipping & pick-up options

Destination & description Price
Nationwide 3-8 days, Rural $15.00
Nationwide 3-4 days, Economy $10.00
Combine with another item you've paid shipping on $0.00
Shipping more than one itemNo extra charge

Estimated delivery times in business days

Seller does not allow pick-ups

Payment Options

Pay instantly by card, Ping balance or saved bank account.

What's Ping?

Afterpay

Four fortnightly interest-free payments.

What's Afterpay?

Questions & Answers

No questions have been asked!

Graham Farish [N] 374-762 BR Mk2F FO First Open BR InterCity (Executive)

Closes: Thu 26th Jun, 1:26pm
5 days, 16 hours, 24 minutes

Buy Now

$109.95 (each)

Or four interest-free payments of $27.49 (plus shipping) with Afterpay

What's Afterpay?
2 available
$10.00 cheapest shipping Nationwide
Expected delivery in 3-4 business days
Buyer Protection covers you up to $2,500 on this item when you pay with Ping or Afterpay if your item doesn't show up or isn't as described.
ironhorse_nz profile image
ironhorse_nz 100% positive feedback Seller located in Christchurch City, Canterbury
Advertisement

About the store

ironhorse_nz

100% positive feedback
address verified in trade
Location
Christchurch City
Member since
Tuesday, 29 September 2020
View Store

Graham Farish [N] 374-762 BR Mk2F FO First Open BR InterCity (Executive)

We are upgrading some of our systems
Learn more